Back
Inland Transport· Live Cargo Tracking

Transporter En Route · On schedule to arrive in Nairobi on Friday, Sep 25

Secured on an enclosed auto carrier truck traveling via the highway corridor.

Final Handover Target

25 Sep 2026

Nairobi, Kenya

TRK-NXS-9942Stock: NAX-006VIN / Chassis: KF2P-301982

2022 Mazda CX-5 XD L Package

Customer: Kelvin Mutiso · Destination: Nairobi, Kenya · Shipping method: container

Delivery progress88%
Estimated Handover:25 Sep 2026

Live vessel location

Latest position reported by the ship's tracking system

Location updates active
Carrier vesselONE MarvelVoyage 0041E
Current regionMombasa Kilindini Port (Discharged)Cruising on schedule
Destination portPort of MombasaKenya
Estimated port arrivalSunday, Sep 20Target dock date
Vessel Technical Telematics (IMO, Speed, Coordinates)
▼

Live nautical sensor and satellite AIS data for maritime logistics and clearance agents.

IMO Registry9398321Singapore
Vessel Speed0 KnotsHeading 0° SW
Coordinates-4.0538°, 39.6644°Mombasa Kilindini Port (Discharged)
AIS StatusSatellite AIS ActiveTransponder Polled
Departure port

Nagoya Port, Japan

Departed: 28 Aug 2026

Indian Ocean Corridor
Arrival port

Port of Mombasa, Kenya

ETA: 20 Sep 2026

Shipping documents

Bill of ladingMSA-BL-2026-7719
Shipping booking numberONE-CONT-88124
Pre-export inspectionJEVIC-EA-2026-9102
View verified inspection record

Your clearing contact

East Africa Freight Logistics

Mombasa Port Kilindini Customs Bureau

Import eligibility

KEBS KS 1515:2019 Gazetted

Full Domestic Import Approval

Fully Compliant

Vehicle Vintage: 2022 (4 yrs old) · RHD Steering

Meets all Kenya regulatory standards. Eligible for direct customs entry and national registration.

Journey updates

Each completed or expected step from export inspection to customer handover.

Step 1

Japanese Pre-Shipment Inspection (JEVIC)

JEVIC certificate 9102

Nagoya Port Vehicle Facility·Completed 25 Aug 2026, 11:00 UTC

Certified roadworthy. Kept in covered bonded vehicle warehouse prior to container stuffing.

Step 2

Port of Nagoya Container Stuffing & Sealing

Customs Bolt Seal #NY-88912

Nagoya Port, Japan·Completed 27 Aug 2026, 14:30 UTC

Loaded into 40ft High-Cube container with marine timber chocks and 5-ton ratcheted lashing belts.

Step 3

Ocean Transit Nagoya to Mombasa

ONE Port Berthing Notice

Indian Ocean Sea Lanes·Completed 20 Sep 2026, 12:00 UTC

Vessel completed safe voyage. No maritime incidents recorded.

Step 4

Mombasa CFS Container Unsealing & Yard Intake

KRA Joint Verification Cleared

Mombasa Port Auto Yard·Completed 22 Sep 2026, 09:30 UTC

Container unsealed under KRA customs supervision. Initial gate inspection completed with 0 damages.

Step 5

Customs Duty Assessment & Gate Pass Release

KRA Outward Release Docket

Mombasa Port Customs·Completed 23 Sep 2026, 15:00 UTC

All KRA import duties, IDF, and RDL settled. Customs Outward Gate Pass issued.

Step 6

Car-Carrier Transit to Nairobi (A109 Highway)

Transit Telematics Live

En Route near Mtito Andei, Kenya·Estimated 25 Sep 2026

Transport truck KDA 892M currently between Voi and Mtito Andei. Speed monitored via telematics.

7
Step 7

PDI Gate Check-In & Final Customer Handover

Nexus PDI Scheduled

Nexus Auto Showroom, Ngong Road Car Bazaar·Estimated 25 Sep 2026

Final showroom preparation and buyer handover scheduled upon carrier arrival.

Back to Track & Trace